MODULAR TECHNOLOGY
Modular construction is an innovative construction method in which buildings are created
of prefabricated modules, which are manufactured with the utmost care under controlled factory conditions. They are then transported to their destination, where they are assembled into a single unit.
This advanced technology allows for a significant reduction in the time taken to complete a project,
while maintaining the highest quality and precision.
Modular construction process
Design stage
Complex design taking into account the specifics of modular technology.
Production at the factory
Module production
under controlled
factory conditions.
Foundation work
Simultaneous preparation of the foundations on site.
Transport
Transport of finished modules to site.
Assembly
Assembly of modules using specialised equipment.
Acceptance of the investment
Cosmetic adjustments
and connection of the installation
Advantages of modular technology
Speed of execution
Projects can be completed up to 50% faster than traditional construction.
PREDICTABILITY OF DEADLINES
Production under controlled factory conditions eliminates weather-related delays.
COST OPTIMISATION
A shorter construction schedule leads to lower financing costs and earlier revenue generation.
SUSTAINABLE DEVELOPMENT
Modular construction is an environmentally friendly construction method that minimises construction waste (approximately 2%).
LIGHTWEIGHT CONSTRUCTION
Modular structures are relatively lightweight compared to traditional concrete structures.
LOGISTICS
Modular construction
results in a reduction of traffic
traffic around the construction site
by up to 75%.
QUALITY
CONSTRUCTION
Strict quality control
at the factory ensures precise manufacture with minimal tolerances.
FREEDOM OF DESIGN
Our modular systems offer great flexibility in terms of dimensions and can be adapted to different types of facades.
THE USE OF MODULAR TECHNOLOGY
CRITERIA
TRADITIONAL CONSTRUCTION
Construction time
24+ months
13-17 months (50% faster)
13-17 months (50% faster)
Employees on site
100% baseline
Reduction of 70%
Reduction of 70%
Quality tolerance
±20mm
±5mm (factory control)
±5mm (factory control)
Material waste
30-40%
2-5% (95% reduction)
2-5% (95% reduction)
Vehicle traffic
100% baseline
75-90%
75-90%
CO₂ emissions reduction per project
-
Up to 50 000 tonnes
Up to 50 000 tonnes
Project standardisation
Limited
75% from the standard library
75% from the standard library
Financial needs at the beginning
10-20%
Down payment of 40-70%
Down payment of 40-70%
Cash flow cycle
24+ months to return
Revenue generation after 13 months
Revenue generation after 13 months
Dependence on the weather
High
Only 3-4 weeks on site
Only 3-4 weeks on site
Design flexibility
Changes during construction
Early project finalisation required
Early project finalisation required
Security options
Tangible assets
Raw materials/modules as collateral
Raw materials/modules as collateral
Modular technology is used in a wide variety of projects
The rapid realisation of hotel facilities allows
to generate revenue in advance.
Effective solution for projects
with repeatable housing units.
Flexible business spaces adapted
to meet changing needs.
Rapid implementation of hospitals, clinics
and other healthcare facilities.
Modern educational spaces that meet the highest standards.